Built on semantic SEO & the Koray framework

The holistic SEO platform built for topical authority.

Holistic Rank unifies technical audits, on-page analysis, schema generation, entity research, topical maps, and guest-post outreach into one workspace — engineered around search-intent, contextual hierarchy, and E-E-A-T.

  • Entity-first research
  • Schema-ready content
  • Koray-aligned topical maps
One graph · Every module

Every module reads from one entity graph.

Projects, semantic SEO, search-console data, keywords and guest posts — they all reference the same source of truth.

Central

Entity Graph

LIVE
Entities
Topical Map
Schema
Authors
Keywords
Backlinks

Entities

1,248

Edges

3,902

Coverage

94%

01

Entity Sub Entity

1,248 indexed

reads graph
02

Search Console

↑ 12% CTR

reads graph
03

SEO Stats

94 health score

reads graph
04

Semantic SEO

21 entities

reads graph
05

keywords

+47 trending

reads graph
06

SEO Project

3 active

reads graph
07

Project Management

12 tasks today

reads graph
08

Guest Post

5 live links

reads graph

20+

SEO modules in one workspace

8

Schema.org types generated

100%

Semantic SEO aligned

1 click

From audit to action

A note from the team

We got tired of stitching 9 tools together.

Before Holistic Rank, a normal Tuesday looked like this: Ahrefs open for backlinks, Screaming Frog running a crawl, a Google Sheet tracking guest-post orders, a schema generator in one tab, ChatGPT in another writing briefs, Search Console in a third, and a tenth browser window full of entity research nobody would remember to use tomorrow.

The work itself wasn't the problem. The context was. Every decision happened in isolation — the topical map never met the audit, the audit never met the schema, the schema never met the outreach. Authority got assembled by hand, one spreadsheet at a time.

So we built the thing we wished already existed: one workspace where every module reads from the same entity graph, the central search intent is declared once, and every artifact downstream — a scan, a brief, a schema, a backlink — contributes to a single measurable topical authority score.

That's the whole product in one sentence. Everything else below is just how we deliver on it.

The Holistic Rank team

Building in public · Remote-first

See it in action

Five screens we couldn't find anywhere else — so we built them.

Holistic Rank project dashboard with KPI cards and progress bar

The first screen that actually tells you what to do next.

Most SEO tools dump a pile of numbers on you and leave. Our project dashboard is different — it shows live Search Console metrics, your monthly deliverable progress, and health scores side-by-side, so the next action is never more than one click away.

  • GSC clicks, impressions, CTR & position with 28-day deltas
  • Monthly targets for guest posts, schemas, scans, entities & more
  • Speed, E-E-A-T, On-Page and Technical scores — one glance
Topical map view showing central entity and clustered sub-topics

Stop guessing what to write. See the map.

Declare your central entity, and Holistic Rank builds the topical map around it — macro clusters, meso sub-topics, micro attributes. You don't chase keywords anymore; you fill coverage gaps the same way Google measures them.

  • Central entity → clustered sub-entities → required attributes
  • Live coverage score tied to pages you've actually published
  • Gap list you can assign straight into the task board
Schema generator showing JSON-LD output for an article

Eight schema types. One prompt. Valid JSON-LD.

Paste a URL, pick a type, and the AI extractor reads the page, pulls the right fields, and hands you validated schema markup you can ship. No more copying from generator sites and praying Search Console doesn't yell at you.

  • Article, Product, LocalBusiness, FAQ, HowTo, Organization, Event, Review
  • URL-to-schema extraction — no manual field filling
  • Zod-validated output, copy-paste or download as JSON-LD
Technical SEO audit results grouped by severity

Audits that read like a to-do list, not a research paper.

Crawl, PageSpeed, Core Web Vitals, indexability, redirect chains, broken internals — all in one run. Issues are grouped by severity and each one is linked straight to the page it hurts, so triage takes minutes instead of afternoons.

  • Full crawl + Lighthouse + CWV in a single audit
  • Issues ranked by traffic impact, not alphabetical
  • One-click recheck after you've pushed a fix
Guest post outreach catalog and order tracker

Outreach that lives next to the work it feeds.

Browse the catalog, brief the anchor text, place the order, track it to publish — all inside the same project as the page it's pointing to. No more spreadsheet archaeology when a client asks where a link came from six months later.

  • Shared website catalog with DR, traffic and price
  • Anchor-text briefs linked to the target URL in your project
  • Order status + backlink verification on one timeline

About Holistic Rank

SEO is no longer keywords. It's semantics, entities, and intent.

We built Holistic Rank for modern SEO teams who think in topical maps instead of keyword lists. Every module — from the site audit to the schema generator — is wired to the same entity graph, so the work you do on one page compounds across your whole domain.

The result is an SEO platform that understands macro context, micro context, and source context — the three pillars Koray Tuğberk Gübür identified as the foundation of semantic search success.

  • Central search intent

    Every project starts with a declared central entity and search intent, so every artifact — pages, schemas, outreach — stays on topic.

  • Unified entity graph

    Topical maps, entities, internal-link suggestions and E-E-A-T signals all read from the same graph. One source of truth, zero context switching.

  • Measurable topical authority

    Live coverage score, historical data and Search Console deltas tell you exactly when you've earned authority — not just ranked once.

Everything in one workspace

The SEO toolkit your team actually needs — no tab jungle.

31+ tightly-integrated modules, one entity graph, zero context switching.

  • Entity Research Engine

    Discover, cluster and score the entities Google sees on your page.

  • Topical Maps

    Generate full topical maps with macro, meso and micro coverage at a glance.

  • Topical Authority Scoring

    Measure how thoroughly you cover your topic — and where the gaps are.

  • E-E-A-T Scoring

    Experience, expertise, authoritativeness, trust — scored per page.

  • Site Audit

    Crawl, score and fix every technical-SEO layer in one pass.

  • On-Page Analyzer

    Title, meta, heading, content and link scoring backed by semantic field checks.

  • Schema Markup Generators

    Eight schema types, AI-extracted from any URL, validated, copy-paste ready.

  • Search Console Integration

    Native GSC sync inside every project — clicks, impressions, CTR, position.

  • Guest Posts Manager

    Brief, place, track and prove backlinks — inside the project they support.

  • Image Compressor & Converter

    Compress JPG, PNG and WebP. Convert to multi-size favicon ICO. In your browser.

How we're different

Legacy tools track rankings. Holistic Rank builds authority.

Ahrefs, SEMrush and Moz are great at reporting what happened. We're built to change what happens next — using the same semantic principles Google's ranking systems actually use.

Capability

Holistic Rank

Legacy SEO tools

Central search intent declared per project
Entity graph shared across every module
Topical maps with contextual hierarchy (macro → micro)
Partial
8 schema types with AI-powered URL extraction
Limited
E-E-A-T scoring tied to content + org signals
Guest-post outreach inside the same workspace
Monthly deliverable targets + auto-synced progress
Built on the Koray semantic SEO framework
Built on the Koray framework

A semantic SEO-friendly platform, by design.

Holistic Rank is engineered around the principles Koray Tuğberk Gübür codified — the same semantic fundamentals modern search engines use to judge authority. The framework isn't a feature; it's the spine of the product.

Contextual hierarchy

Macro, meso and micro topics organized the way Google's systems evaluate relevance — not the way spreadsheets list keywords.

Central search intent

Every project is anchored to a declared central entity and intent. Every artifact downstream inherits that context.

Entity attribute coverage

We track the attributes and sub-entities your central topic requires — so you can see gaps before your competitors do.

Structured data by default

Schema markup is generated from the same entity graph powering your topical map. Consistency becomes the default, not an afterthought.

Why it matters

When your audit, content, schema and outreach all read from a shared entity graph, you stop optimizing pages in isolation and start building topical authority — the only ranking factor that compounds.

The workflow

From central entity to shipped backlinks — in one workspace.

  1. Declare the central entity

    Start a project by pinning the topic and search intent you're claiming. Holistic Rank frames every downstream decision around it.

  2. Map the topic

    Generate a topical map, surface the sub-entities and attributes you need to cover, and prioritize gaps against your current index.

  3. Audit + optimize

    Run technical, on-page and E-E-A-T checks. Generate schema straight from your URLs. Fix issues, track them against monthly targets.

  4. Publish + link

    Produce briefs and anchor-text suggestions, order guest posts from the catalog, and watch GSC metrics flow back into the dashboard.

Early signal

What people are saying before we've even launched.

The topical map alone replaced two tools we were paying for. Having it sit next to the audit and the schema generator is the part nobody else gets right.

Early access user

SEO agency owner

First platform I've used that actually treats E-E-A-T as a scorable thing instead of a blog-post buzzword.

Early access user

In-house SEO lead

Set up the project, connected Search Console, had my first topical map in under ten minutes. The monthly targets feature is going straight into our client reports.

Early access user

Content strategist

Frequently asked questions

Everything you need to know.

Build topical authority the modern way.

Create your first project in under a minute. Connect Search Console, declare your central entity, and let the platform do the heavy semantic lifting.